|
| Tyco Thermal Controls designs the HMS using in-house design tools and databases. These tools standardize the engineering process and ensure that designs are optimized and reviewed to insure that they meet or exceed the customer's expectations. |
(Our design databases facilitate the tracking of drawing revisions. If the customer revises incoming documents, our tools and databases determine which heat-tracing designs may be affected. This ensures timely and accurate management of design changes and the ability to share live design data with our internal project team.)
|
Supply of Materials |
The Procurement Department orders, ships and coordinates delivery and incoming inspection in order to insure proper product is on hand when needed
|
|
We develop inspection/test plans (ITP's) to ensure that construction activities are performed in accordance with our quality management system and our customer's expectations.
|
|
Where feasible, we utilize commissioning specialists, independent from the craftspeople that installed the heat management system to perform commissioning activities. This independent test ensures that each heat management system is tested and commissioned in accordance with Tyco Thermal Control's customer and manufacturer requirements.
|
Review of Customer Systems |
| We perform independent reviews of existing customer heat management systems to ensure that each HMS is installed in accordance with established procedures, functions properly and operates within design parameters. |